Concurrent sustainable engineering mainly to reduce TQM costs
Abstract
The industrial companies have become in front of a new reality that necessitates them to strive towards modern costly and administrative techniques and methods instead of continuing to rely on the traditional cost-effective methods that have become insufficient to provide the appropriate information and do not keep pace with the new requirements. And manufacturing, production and marketing simultaneously, which provides savings in total quality management (TQM) costs and gives flexibility in developing and improving products, which in turn helps companies to provide products at reasonable prices to meet the desires of customers, maintain their market share and achieve the greatest amount of profits. To achieve the goal of the research, this research has been divided into four parts. In the first topic, the research methodology was discussed, and the second topic dealt with synchronous sustainable engineering, and in the third topic, the costs of total quality management (TQM) were addressed, leading to the fourth topic showing the importance of simultaneous sustainable engineering in Reducing the costs of total quality management (TQM), and finally, the most important conclusions reached by the researchers and the most important recommendations made in light of them were reviewed.
References
2. Al-Zamili, Ali Abdul-Hussein, (2017), “The integration of the techniques of value analysis and simultaneous engineering and its role in reducing costs and achieving competitive advantage”, unpublished doctoral thesis, College of Administration and Economics, University of Baghdad.
3. Shehab El-Din, ShaimaaShaabanMetwallyDesouky, (2010), “Measuring quality costs based on the (ABC) system for the purposes of cost reduction and management”, Master’s thesis in commercial sciences, Faculty of Commerce, Suez Canal University, Republic of Egypt.
4. Barahona , D . E Moreiro, 2003, “ A ontology – based Approach to support the Implementation of Concurrent Engineering in the Innovation process “ Master thesis of science in technology an Innovation Management.
5. Chase, richard b. , aquilano, nicholas j. &jacobs, f. Robert, (2001), "operations management from competitive advantage", 9th ed., mcgraw-hill higher education, new york.
6. Deshpande, Anant. (2019). Total Quality Management, Concurrent Engineering andا Manufacturing Performance: An Empirical Investigation. Journal of Operations and Strategic Planning. 2. 35-64. 10.1177/2516600X19845230.
7. Doshi, N. C., Bhalani, J. V., &Bechara, S. M. (2016). Concurrent Engineering Principles–Preach and Practice.
8. Drury, colin, (2008), "management and cost accounting", 7th ed.
9. Garrison, Ray & Noreen, Eric," Managerial Accounting", 10th ed., McGraw Hill Inc2015.
10. Hambali, A., Salit, M.S., Ismail, N., Yusoff, N., &Karim, M.S. (2009). "The important role of concurrent engineering in product development process".
11. Horngren Charles, I. &Datar, Srikant, M. & Foster, George, &Rahan, V. Madhav, &Ittner, Christopger, "Cost Accounting A Managerial Emphasis" 13th ed, Person, Prentice-Hall 2021.
12. Jackson, steven r., sawyers, roby b. &jenkins, gregory j, (2009), "managerial accounting", 5th ed., south-western,usa, p:45
13. Juran, Joseph & Blanton, Godfrey "Juran's Quality Handbook" 5th ed, McGraw – Hill, Section eight, 2009.
14. Kinney, Michael R. , Prather-Kinsey, Jenice&Raiborn, Cecily, (2011) "Cost Accounting : Foundations and Evaluation", 6th ed., Thomson South-, USA, p:757.
15. Krajewski, lee j. &ritzman, larry p, (2005), "operations management : processes and value chains", 7th ed., pearson prentice hall, upper saddle river, new jersey.
16. Kusar, J., Duhovnik, J., Grum, J. and Starbek, M. (2004). How to reduce new product development time. Journal of Robotics and Computer-Integrated Manufacturing.
17. Mani, M. F. ; Manikandan, K. D. &Manikandan, M. P. (2015), "Design for Manufacturing Based on Concurrent Engineering", International Journal of Innovative Researches in Sciences, Vol.(4), No.(2), pp:(128-131).
18. Martínez, J. M. B., &Selles, M. E. S. (2015), "A fuzzy quality cost estimation method", Fuzzy Sets and Systems, 266, 157-170.
19. Neyestani , Behnam ,(2017) ,"Quality Costing Technique: An Appropriate Financial Indicator for Reducing Costs and Improving Quality in the Organizations" , MPRA Paper No. 77375, posted 9.
20. Ogawa, A. (2008). Concurrent engineering for mission design in different cultures (Doctoral dissertation, Massachusetts Institute of Technology).
21. Panayotova, T. (2018). The Role Of Concurrent Engineering In Development And Digitalization Of Industrial Activities, Innovations, 6(1), 12-14.
22. Rihar, L., Žužek, T., &Kušar, J. (2020). How to successfully introduce concurrent engineering into new product development? Concurrent Engineering, 1063293X20967929.
23. Schiffauerova, Andrea & Thomas, Vince., 2006, "A Review Of Research On Cost Of Quality Models And Best Practice", International Journal Of Quality And Reliability, Vol. 23, No. 4, P. 1.
24. Sower , Victor E. & Quarles , Ross & Broussard , Eric ,(2007) ," Cost of quality usage and itsrelationship to quality systemmaturity" , International Journal of Quality &Reliability ManagementVol. 24 No. 2.
25. Stevenson, william j, (2007), " operation management ", 9th ed., irwinmcgraw-hill, new york.
26. Stevenson, William J.,"Operations Management", Twelfth Edition, McGraw-Hill Education,2015.
27. Bhuiyan, N., Thomson, V. and Gerwin, D. (2006). Implementing concurrent engineering, Journal of Research Technology Management, 49(1), 38-4.